Details: As well as the construction of the vehicle preparation shed, the amount of space available in the lorry yard at Acton Works has also been reduced by the opening of a through road-way from Frank Pick House. A one-way system has been applied, with vehicles entering from Bollo Lane using the Frank Pick House entrance and leaving via the ramp down to the main works access road. It is not known if this applies to all vehicles, as the turns at Frank Pick might be a bit tight for larger vehicles. Anyway, this roadway is to the left of the two trailers shown in this 11th September 2021 photo. The trailers are Dennison T77 and T78, both new in 2017. T77 on the left has a taller headboard and is extendable in length.
Comments (Most recent at top)
Posted ByCommentsDate/Time
RayVehicles entering the lorry yard do so by the main entrance. Only vehicles leaving Frank Pick House make the detour through the lorry yard.Sun 26/09/21, 15:25